OpenSprinkler Forums Hardware Questions OpenSprinkler Pi (OSPi) OpenSprinkler – run concurrent and sequential Re: Re: OpenSprinkler – run concurrent and sequential

#24613

djMax
Member

I’m confused at this answer… Let’s say I have a 24V 300mA transformer (I do), which is 7.2 VA. And let’s say I have 9 Weathermatic solenoids with a 6.6VA inrush and a 5.5VA hold current (I do!) – I *have* to run sequential right? Because two solenoids active at once would be 11VA? In this guys case he’d need a huge-mongous transformer. Related question – I have two of said transformers and OSPi+expansion board. Is there a way to wire it so that both transformers can be used (assuming I handle the software side of it)