OpenSprinkler Forums OpenSprinkler Unified Firmware Reordering stations within a program Reply To: Reordering stations within a program

#62219

Ray
Keymaster

It’s not going to automatically create programs given the constraints of simultaneous valves. Instead, you can manually schedule multiple valves to run at the same time. As I said, each ‘program entry’ can include any set of zones (these will run at the same time). So if you want 4 zones to run at the same time, just choose the set of 4 you want, and create a program entry. Then for the next 4 zones you create another entry, and so on.