I am running into a limitation of a regular sprinkler controller. It has enough zones but I have a creek pump and need to run each zone for several hours so want to run 2 zones each day. With 8 zones that means 4 different day schedules. I have a Hunter system that has only three schedules programmable – for each schedule you set what zones and how long. I can set what days each schedule runs but with only 3 I can’t do what I want. Would have to run three each day to get them in the three schedules. Is it possible with OSpi to set up:
Monday – zones 1 and 2
Tues – 3 and 4
Wed – 5 and 6
Thur – 7 and 8