OpenSprinkler › Forums › OpenSprinkler Mobile and Web App › Program preview shows wrong date for program execution
- This topic is empty.
-
AuthorPosts
-
May 12, 2014 at 7:56 pm #22900
alfiomantineoMemberHi
I OSPi version 1.8.3 and I needed to set-up the watering programs based on interval of 17 days.
(actually I have a watering period of 4 hours every 8.5 days. once during the day once during the night).
in total I have 5 programs running two during the daily period and three during the night to cope with the Midnight transitionWhen I look on “program preview” only the first program is showed correctly all the others have a wrong day start.
Strangely enough if a reduce the interval to 9 days the start day is correct.
On the WEB based interface ( that shows only one day) the start date is correct.Regards
May 12, 2014 at 8:13 pm #26850
SamerKeymasterOkay sounds like a bug in the mobile app. Could you please give me sample programs so I can reproduce and fix?
May 13, 2014 at 5:27 am #26851
alfiomantineoMemberPlease tell me how I can provide them, I am not sure where the files are stored. an alternative I can give all the details.
May 13, 2014 at 11:24 am #26852
SamerKeymasterJust the basic details (type, days, duration, etc.)
May 13, 2014 at 3:55 pm #26853
alfiomantineoMemberP1 interval 17 Days start in 0 day 4 Stations in parallel duration 104 minutes Interval set to 240 (this value obviously is not relevant for me but may have an impact) Start 22:15 End 23:59
P2 interval 17 Days start in 1 day 4 Stations in parallel duration 30 minutes Interval set to 240 (this value obviously is not relevant for me but may have an impact) Start 00:00 End 00:30
P3 interval 17 Days start in 1 day 3 Stations in parallel duration 135 minutes Interval set to 240 (this value obviously is not relevant for me but may have an impact) Start 00:30 End 02:45
P4 interval 17 Days start in 9 day 4 Stations in parallel duration 135 minutes Interval set to 240 (this value obviously is not relevant for me but may have an impact) Start 10:15 End 12:30
P5 interval 17 Days start in 9 day 3 Stations in parallel duration 135 minutes Interval set to 240 (this value obviously is not relevant for me but may have an impact) Start 12:30 End 14:45
May 13, 2014 at 11:50 pm #26854
SamerKeymasterI can definitely replicate this. Let me try to pin down the issue and I will let you know once a fix has been made.
Thanks for the detailed report!
Update: Found it and will be pushing this fix out soon.
Update 2: I found a bug in OSPi I will have to report. The start day byte, days0, is slightly off. Ticket has been submitted here: https://github.com/Dan-in-CA/OSPi/issues/21
May 18, 2014 at 10:05 am #26855
alfiomantineoMemberThanks
I tested the new version … Perfect. -
AuthorPosts
- You must be logged in to reply to this topic.