OpenSprinkler Forums Hardware Questions OpenSprinkler Pi (OSPi) Summer / Winter open and shutdown dates

  • This topic is empty.
Viewing 3 posts - 1 through 3 (of 3 total)
  • Author
    Posts
  • #23011

    rederikus
    Participant

    I am still learning the OSPi. It is a great little device. I am loving it. There is one enhancement that O would like to suggest and that is to have the device toggle the Operation On/Off status automatically at pre-determined dates.

    The reason I suggest this is that once an irrigation system works properly, one tends to forget about it. My idea would be that I could pick a date say, 15th October and have the irrigation system cease watering from that day forward (unless I re-enable it, of course). I would like a second date that I could set in the Spring, 1st week in May perhaps, when the system would start operating again.

    Obviously different places would require different dates and maybe more than one On/Off pair would be required.

    #27402

    Dan in CA
    Participant

    rederikus,

    That’s a perfect candidate for a plugin!

    I’ll make a note of the idea and, if no none else beats me to it, I see about cooking something up when things slow down a bit.

    Dan

    #27403

    rederikus
    Participant

    Hey, thanks, Dan,

    It would be neat if this could be incorporated into both the mobile app and the web interface.

    I am still learning this device and am basically a hardware guy so, my favorite programming language is a soldering iron.

Viewing 3 posts - 1 through 3 (of 3 total)
  • You must be logged in to reply to this topic.

OpenSprinkler Forums Hardware Questions OpenSprinkler Pi (OSPi) Summer / Winter open and shutdown dates