Thanks for replying.
In fact evey time I activate one station, I also need to switch on the 24 VAC pump relay simultaneously with the station activated.
So if I have an area that needs opening of two valves and switching on a relay at the same time, I just need to create a program that opens simultaneously the two valves and powers the relay.
Is that correct? Would the software handle this?
Could you please post a screenshot of the program page showing something similar?
Thanks for clarifying.
Dan