  • in reply to: Work around for freezing OSPI (in remote location) #27363

    Thanks I will apply it

    in reply to: Local Manual Operation #25904

    Hi

    please find attached the schematics ( I was struggling to find the exact connectors to use)

    The resistors are 1.8 Kohm

    in reply to: Interval computation – potential bug #27035

    Hi

    I did update the software roughly 2 weeks ago. So if a new version is available I will try to update it.

    Regarding the error characterization, I noticed the problem around 23:00. -. 00:30 (before it is OK). I am in GMT+1 Timezone

    Regards

    in reply to: Local Manual Operation #25902

    Hi
    I see the menu that you mentioned, but it says that this kind of documents ( sch or pdf) are not allowed.

    Google drive requires an e-mail for sharing a file that I am missing.

    Regards

    in reply to: Local Manual Operation #25900

    Hi Sorry
    it looks like I can not add attachment

    in reply to: Local Manual Operation #25898

    Thanks for the clarification.
    I actually was planning to have a front-end to the OSPi. I would have a toggle switch for each valve exit in order to allow its use automatically or overriding it to manual.
    A led Green will light up in case the valve is commended in automatic and a led red will light up is the override was selected.
    In this set-up I will get as input the 8 valves wire plus the common. I will need however the other AC wire . would it be possible to get it from the EXTOUT connector ?

    Which one would it be ?

    I enclose a schematic (very preliminary to illustrate the concept)
    Regards

    in reply to: Program preview shows wrong date for program execution #26855

    Thanks
    I tested the new version … Perfect.

    in reply to: Program preview shows wrong date for program execution #26853

    P1 interval 17 Days start in 0 day 4 Stations in parallel duration 104 minutes Interval set to 240 (this value obviously is not relevant for me but may have an impact) Start 22:15 End 23:59

    P2 interval 17 Days start in 1 day 4 Stations in parallel duration 30 minutes Interval set to 240 (this value obviously is not relevant for me but may have an impact) Start 00:00 End 00:30

    P3 interval 17 Days start in 1 day 3 Stations in parallel duration 135 minutes Interval set to 240 (this value obviously is not relevant for me but may have an impact) Start 00:30 End 02:45

    P4 interval 17 Days start in 9 day 4 Stations in parallel duration 135 minutes Interval set to 240 (this value obviously is not relevant for me but may have an impact) Start 10:15 End 12:30

    P5 interval 17 Days start in 9 day 3 Stations in parallel duration 135 minutes Interval set to 240 (this value obviously is not relevant for me but may have an impact) Start 12:30 End 14:45

    in reply to: Program preview shows wrong date for program execution #26851

    Please tell me how I can provide them, I am not sure where the files are stored. an alternative I can give all the details.

    in reply to: Local Manual Operation #25896

    Hi
    I was considering to go a step further in local manual operations.
    Basically I was suggesting to have an Hardware front end where to show with a light /led for each valve its status and also to have the possibility to bypass OSPI and opening the valve as needed.

    The idea was simply to add a toggle switch for each valve to allow for automatic or manual (open) with a different color code if the valve was open due to the system request or the local worker decision.